A DOE categorical exclusion from full environmental review, a military airlift, and a new NRC rule that lets commercial licenses reuse DOE and military reviews. Here is what each federal record says, and what it says about the public.
flowchart LR A["Department of Energy
or Department of War
authorizes a test reactor"] --> B["DOE categorical
exclusion (B5.26)
no full environmental review"] B --> C["Reactor is built
and tested
(Ward 250, Emery County)"] C --> D["Company asks the NRC
for a commercial license"] D --> E["NRC may reuse the
DOE or military review
(new rule, Nov. 25)"]
| Agency | Record | Date | What it does |
|---|---|---|---|
| NRC | Final rule adding 10 CFR 50.43(f), Docket NRC-2025-1503 | Approved Oct. 22; published Oct. 26; takes effect Nov. 25, 2026 | A commercial license application may use information from a reactor the Department of Energy or Department of War already authorized and tested |
| DOE | Categorical exclusion B5.26, "Advanced nuclear reactors" | Effective Feb. 2, 2026 | Lets DOE authorize, site, build and run advanced reactors without a full environmental review when it finds the risk low enough |
| DOE | CX-271015, "Valar Ward250 Research Reactor" (DOE-ID-26-005) | 2026 | Used that exclusion for Valar's test reactor at the San Rafael lab in Emery County |
| DOE | Reactor Pilot Program (DE-FOA-0003569) | Selections Aug. 12, 2025 | Test reactors "authorized by DOE ... at sites outside the national laboratories"; companies pay all costs |
| DOE | Fuel Line Pilot Program | Valar selected Sept. 30, 2025 | TRISO fuel made on site "for the Ward250 reactor deployment" |
| Air Force | "Operation Windlord" (name per af.mil) | Feb. 15, 2026 | The Ward 250 reactor was loaded on a C-17 at March Air Reserve Base, Calif., and flown to Hill Air Force Base, then taken on to the lab. The Air Force article describes one C-17; Stars and Stripes reported three |
| NRC | Valar engagement plan, ML26274A394 | Apr. 2, 2026 | Valar: it "does not currently have plans to submit an NRC application." Plan withheld from the public at Valar's request |
| NRC | Weekly report SECY-26-0111 | Filing Aug. 10, 2026 | Valar's revised plan, "outlining plans to seek NRC licensing"; NRC staff offered to observe DOE's review of a "second test reactor, NumenorOne" |
| Federal court | Texas et al. v. NRC, No. 6:24-cv-00507 (E.D. Tex.) | Filed Dec. 30, 2024 | The State of Utah and Valar are plaintiffs seeking to change how small reactors are licensed. The American Nuclear Society reported (Oct. 5, 2026) that the states filed to drop the case. We could not open the court docket to confirm. |
| BLM | "Project Beehive" land application, about 9,000 acres near Price | Reported Sept. 30, 2026 | BLM says it is "currently reviewing the application for completeness." No serial number found in a federal record |
| DOE | Nuclear Lifecycle Innovation Campus | Finalists July 28, 2026 | Utah is one of five finalist states; non-binding agreements signed |
The rule says an application "may include consideration of relevant information gathered from a utilization facility that has been previously authorized by the Department of Energy or the Department of Defense and that has been tested and has demonstrated the ability to function safely. Any reference to such a design must identify how attributes of the authorization satisfy NRC regulations ..."
The NRC says it "will not need to repeat technical reviews previously performed by DOE or DOW ... to the extent that those reviews cover the same scope." It also says "Nothing in this rule delegates to DOE, DOW, or any other agency the NRC's functions" and that it "was not able to quantify these potential savings in a useful way at this time."
The NRC's full answers to the 136 comments are in document ML26282A996. We have not read it yet.
DOE's exclusion B5.26 took effect the day it was published, Feb. 2, 2026. DOE then took 30 days of comment, which it called voluntary. Attorneys general from 11 states and D.C. objected on Mar. 4, writing that "DOE's process to promulgate this CE included no public participation in advance of the effective date" and that "DOE has no authority to authorize commercial power generation or industrial application." Utah did not sign.
The Ward 250 form (CX-271015) says "the proposed action is hereby categorically excluded from further NEPA review." It describes a 250-kilowatt-thermal reactor on about 2 acres of a 20.6-acre site, run for about 12 months, then 6 months of cooldown and 6 of decommissioning. It has no public notice or comment language. The Utah historic preservation office "concurs that no historic properties will be affected."
The other side, from the same records: the NRC says the right to request a contested hearing is unchanged and the new rule does not lower its safety standard. BLM says the public will get input on Valar's land request through the federal environmental review. TerraPower's Wyoming permit and Holtec's Michigan application went through standard NRC notice and hearing steps.
Hill Air Force Base appears in the record only as the stop where the Ward 250 reactor landed. The Army's nine candidate sites, its Janus program awards (Aug. 26, 2026, five bases) and the Air Force's first microreactor sites name no Utah installation.
At Hill AFB on Feb. 15, 2026, Under Secretary of War Michael Duffey said: "It's clear to me that advancing President Trump's priority on nuclear energy depends on close coordination between the Department of Energy and the Department of War." The Air Force article reports, in its own words, that he said the future of warfare is energy-intensive and includes AI data centers, and that the War Department will need to build its own energy infrastructure.
How we read these records: most documents were read as text through a reading tool on Oct. 29, 2026, not as rendered pages. Short quotes are marked; check any quote against the original before reusing it. "Not found in the records searched" means we looked and did not find it, not that it does not exist.
Utah Hive Politicsfrom the publisher of The Weber County HiveIndependent · Accountability · JournalismThe Weber County Hive and Utah Hive Politics: the people's publication. We investigate what's best for the public as a whole, not for any party or special interest group. We report public records. You decide.
Send a tipTips we checkedSee a mistake? Tell us
We never name tipsters. When we correct a page, the fix and its date are shown on the page.
Nuclear Energy shelf · Master Index (Hive library) · Read on Substack