Data Centers · Bill Case File · 2026 General Session
H.B. 76 (2026): The First Law Requiring Data Centers to Report Their Water
Starting in 2026, new large data centers in Utah must tell the state how much water they expect to use and how much they actually take, and the state must post each one's numbers online. The law covers only data centers that open on or after July 1, 2026. None of the Utah data centers with public water numbers today fall under it.
The Weber County Hive — We report public records. You decide.
75 acre-feet
yearly water withdrawal that triggers the law, about 24.4 million gallons
July 1, 2026
data centers that begin operating before this date are not "new" under the law
Sept. 1
yearly deadline for the state to post each covered center's water withdrawals
0 of 7
Utah data centers with public water numbers that the law covers
The short version
H.B. 76 requires new large data centers to report their water: expected use before construction, actual withdrawals every year after.
The state's Division of Water Rights must post each covered center's yearly withdrawals online, by name, not lumped together.
It applies only to data centers that start operating on or after July 1, 2026, that use 75 acre-feet a year or more, and that cover at least 10,000 square feet.
The seven Utah data centers with water numbers in public reporting all opened before that date, so the law doesn't reach them.
Words to know
Tap or click a card to flip it.
The bill
Item
From the enrolled bill
Title
Data Center Water Transparency Amendments
Primary sponsor
Rep. Jill Koford
Senate sponsor
Sen. Scott D. Sandall (also primary sponsor of S.B. 132, the 2025 large-load power law)
Effective
May 6, 2026
Who is covered
Data centers of 10,000 square feet or more, withdrawing 75 acre-feet a year or more, that begin operating on or after July 1, 2026
What a covered data center must report
flowchart TD
A["90 to 360 days before construction Tell the local water provider, in writing, the water it expects to need"] --> B["Before construction Report to the Division of Water Rights: county and city, expected yearly withdrawal, discharge treatment, water reuse plans"]
B --> C["Every year by July 1 Report last year's actual withdrawals and efforts to cut water use"]
C --> D["Every year by Sept. 1 The state posts each covered center's withdrawals online, by name"]
The Division of Water Rights also posts a county-by-county summary of information the law treats as protected, with company names removed.
Who would be covered, and who isn't
These are the Utah data centers with water numbers in public reporting. All seven were operating before July 1, 2026, so H.B. 76 does not require them to report. The last column shows whether each one's yearly use is above the 75-acre-foot line.
Data center (city)
Gallons a year
Acre-feet (Hive calculation)
Above 75 acre-feet?
NSA Utah Data Center (Bluffdale)
126 million
about 387
Yes
Aligned Data Centers (West Valley City)
80 million
about 246
Yes
Aligned Data Centers (West Jordan)
47.4 million
about 145
Yes
Meta (Eagle Mountain), 2024, reported by Meta
about 35 million
about 107
Yes
eBay (South Jordan)
19.5 million
about 60
No
DataBank Granite Point (Bluffdale)
7.7 million
about 24
No
Novva (West Jordan)
3 million
about 9
No
Sources: city water provider records for about Oct. 2024 to Sept. 2025, as reported by the Salt Lake Tribune / Great Salt Lake Collaborative, Jan. 14, 2026; Meta's own 2024 figure. Acre-feet = gallons ÷ 325,851. These are withdrawals as reported, not water used up.
Pins are approximate, placed at the city named in the reporting. Click a pin for details.
One case in point: Meta's monthly water use is confidential
Meta's 2018 agreement with Eagle Mountain keeps the campus's monthly water use confidential, so the only public number is the yearly total Meta reports itself. H.B. 76 would not change that for buildings already operating. Meta case file →
Stratos: reporting written into a draft agreement, with a confidentiality clause
Stratos's draft interlocal agreement with Box Elder County requires MIDA to report energy, jobs and other figures to the county each year, the reporting tied to H.B. 76. The same section says the information may be marked confidential, and the county must treat it that way. That agreement is posted as an unsigned draft. Separately, Stratos filed a water rights change application in October 2026 claiming a closed recycling loop with 90% recovery. Stratos pages →
Open questions this page does not answer
Expansions. Whether a new building at a campus that opened before July 1, 2026, such as Meta's or QTS's in Eagle Mountain, counts as a "new large data center" is not settled in the records reviewed.
What counts as protected. The bill lets some reported information be treated as protected and published only in a county summary. Which items fall in that category is not listed on this page.
First postings. No covered data center would have a full year of data until 2027, so the first posted numbers should come in 2027 or later.
The other side
It adds rules written for data centers. Covered centers' numbers get posted by name, not just in county totals.
The threshold is low enough to matter. At 75 acre-feet, four of the seven centers with public numbers would have qualified if they were new.
It asks for plans, not just totals. Covered centers must describe water reuse, discharge treatment and efforts to cut use.
People in this record
Rep. Jill KofordPrimary sponsor of H.B. 76. Also the 2026 Senate District 5 candidate. Candidates 2026 →
Sen. Scott SandallSenate sponsor of H.B. 76 and primary sponsor of S.B. 132 (2025), the law that lets large data centers build their own power. S.B. 132 →
Questions to ask, and whom to ask
Utah Division of Water Rights
Has any data center filed an H.B. 76 pre-construction report yet? Where on your website will the yearly numbers be posted?
Your state legislators
Should data centers that opened before July 1, 2026 also report their water use?
Eagle Mountain City Council
Would Meta's new buildings be covered by H.B. 76, and will the city release Meta's monthly water use?
Box Elder County Commission
If the Stratos agreements are signed, will the county keep the yearly water and jobs reports confidential?
Utah Legislature, H.B. 76 (2026), Data Center Water Transparency Amendments, enrolled copy — le.utah.gov. Read from PDF text.
Utah Legislature, transmittal letter for 3rd Substitute H.B. 76, March 5, 2026 — pf.utleg.gov.
Utah House of Representatives, "Utah Data Center Laws," Sept. 8, 2026 — house.utleg.gov.
Salt Lake Tribune / Great Salt Lake Collaborative, "Can Utah become a data center hub without draining its water supply?" Jan. 14, 2026 — greatsaltlakenews.org. Figures as reported on the Hive's Great-Salt-Lake page.
Deseret News, "Stratos project water application reveals new details," Oct. 16, 2026 — deseret.com.
MIDA, Stratos draft Interlocal Cooperation Agreement §5(i) — draft and unsigned as posted by MIDA; read Sept. 4, 2026.
Utah Hive Politicsfrom the publisher of The Weber County HiveIndependent · Accountability · Journalism
The Weber County Hive and Utah Hive Politics: the people's publication. We investigate what's best for the public as a whole, not for any party or special interest group. We report public records. You decide.