The Hive bee sealUtah Hive Politicsfrom the publisher of The Weber County HiveThe people's publication. We investigate what's best for the public as a whole, not any party or special interest.
Data Centers · DC 200.04← Data Centers home · ← Bills docket · ← Hive library (every repo)
Data Centers · Bill Case File · 2026 General Session

H.B. 76 (2026): The First Law Requiring Data Centers to Report Their Water

Starting in 2026, new large data centers in Utah must tell the state how much water they expect to use and how much they actually take, and the state must post each one's numbers online. The law covers only data centers that open on or after July 1, 2026. None of the Utah data centers with public water numbers today fall under it.

Posted Oct. 24, 2026 · Updated Oct. 24, 2026 · Page look updated Nov. 2, 2026

The Weber County Hive — We report public records. You decide.

75 acre-feet
yearly water withdrawal that triggers the law, about 24.4 million gallons
July 1, 2026
data centers that begin operating before this date are not "new" under the law
Sept. 1
yearly deadline for the state to post each covered center's water withdrawals
0 of 7
Utah data centers with public water numbers that the law covers

The short version

Words to know

Tap or click a card to flip it.

The bill

ItemFrom the enrolled bill
TitleData Center Water Transparency Amendments
Primary sponsorRep. Jill Koford
Senate sponsorSen. Scott D. Sandall (also primary sponsor of S.B. 132, the 2025 large-load power law)
EffectiveMay 6, 2026
Who is coveredData centers of 10,000 square feet or more, withdrawing 75 acre-feet a year or more, that begin operating on or after July 1, 2026

What a covered data center must report

flowchart TD A["90 to 360 days before construction
Tell the local water provider,
in writing, the water it expects to need"] --> B["Before construction
Report to the Division of Water Rights:
county and city, expected yearly withdrawal,
discharge treatment, water reuse plans"] B --> C["Every year by July 1
Report last year's actual withdrawals
and efforts to cut water use"] C --> D["Every year by Sept. 1
The state posts each covered
center's withdrawals online, by name"]

The Division of Water Rights also posts a county-by-county summary of information the law treats as protected, with company names removed.

Who would be covered, and who isn't

These are the Utah data centers with water numbers in public reporting. All seven were operating before July 1, 2026, so H.B. 76 does not require them to report. The last column shows whether each one's yearly use is above the 75-acre-foot line.

Data center (city)Gallons a yearAcre-feet (Hive calculation)Above 75 acre-feet?
NSA Utah Data Center (Bluffdale)126 millionabout 387Yes
Aligned Data Centers (West Valley City)80 millionabout 246Yes
Aligned Data Centers (West Jordan)47.4 millionabout 145Yes
Meta (Eagle Mountain), 2024, reported by Metaabout 35 millionabout 107Yes
eBay (South Jordan)19.5 millionabout 60No
DataBank Granite Point (Bluffdale)7.7 millionabout 24No
Novva (West Jordan)3 millionabout 9No

Sources: city water provider records for about Oct. 2024 to Sept. 2025, as reported by the Salt Lake Tribune / Great Salt Lake Collaborative, Jan. 14, 2026; Meta's own 2024 figure. Acre-feet = gallons ÷ 325,851. These are withdrawals as reported, not water used up.

Pins are approximate, placed at the city named in the reporting. Click a pin for details.

One case in point: Meta's monthly water use is confidential

Meta's 2018 agreement with Eagle Mountain keeps the campus's monthly water use confidential, so the only public number is the yearly total Meta reports itself. H.B. 76 would not change that for buildings already operating. Meta case file →

Stratos: reporting written into a draft agreement, with a confidentiality clause

Stratos's draft interlocal agreement with Box Elder County requires MIDA to report energy, jobs and other figures to the county each year, the reporting tied to H.B. 76. The same section says the information may be marked confidential, and the county must treat it that way. That agreement is posted as an unsigned draft. Separately, Stratos filed a water rights change application in October 2026 claiming a closed recycling loop with 90% recovery. Stratos pages →

Open questions this page does not answer

The other side

People in this record

Rep. Jill KofordPrimary sponsor of H.B. 76. Also the 2026 Senate District 5 candidate. Candidates 2026 →
Sen. Scott SandallSenate sponsor of H.B. 76 and primary sponsor of S.B. 132 (2025), the law that lets large data centers build their own power. S.B. 132 →

Questions to ask, and whom to ask

Utah Division of Water Rights
Has any data center filed an H.B. 76 pre-construction report yet? Where on your website will the yearly numbers be posted?
Your state legislators
Should data centers that opened before July 1, 2026 also report their water use?
Eagle Mountain City Council
Would Meta's new buildings be covered by H.B. 76, and will the city release Meta's monthly water use?
Box Elder County Commission
If the Stratos agreements are signed, will the county keep the yearly water and jobs reports confidential?

Where this connects

Behind this piece

5records read
30dates and figures checked
1record checked but not used
~6searches run (estimate)
Sources and how they were read
Utah Hive Politicsfrom the publisher of The Weber County HiveIndependent · Accountability · Journalism

The Weber County Hive and Utah Hive Politics: the people's publication. We investigate what's best for the public as a whole, not for any party or special interest group. We report public records. You decide.

Send a tipTips we checkedSee a mistake? Tell us

Tips and corrections: webercountyhive@gmail.com

We never name tipsters. When we correct a page, the fix and its date are shown on the page.

Data Centers home · Master Index (Hive library) · Read on Substack